Shannon Management Five Points
First, the quality of soil preparation: The cultivated land should be selected as high-desert, land that can discharge energy, and 5000-7000 kg of organic fertilizer in Mushi. Second, transplant planting: spacing 45 cm, spacing 15 cm, immediately after planting, watering and spraying a new high-fat film to reduce the slow seedling period, so that the seedlings thrive immediately after the cultivator, loose soil, Paul. Third, the cultivator management: timely watering in summer to keep the soil see dry see wet. four. Picking: At the right temperature, the buds germinate 45 to 50 days, and the shoots begin to shoot when they are about 25 cm long. When picking lateral buds, care should be taken to leave 1-2 leaves to protect the buds from sprouting. During the harvest period, the weather should turn warm and it should be watered in time to keep the soil moist and dry. Fives. Pest control: There are fewer pests and diseases in eucalyptus and it is not necessary to fight drugs during the budding period. The botanical bogey should not be used as a continuum, and the blight of the seedling stage is serious. Once the disease occurs, it can be sprayed with 25% carbendazim 600 times solution and a new high-fat film for prevention and treatment. Liquid chemical,Caramel Color Powder,Cocoa Powder,Natural Food Color Powder,Carrageenan Jelly Powder Shanghai J.Shine Co.,Ltd , https://www.jshinechem.com